Your systems. Our engineers. Wherever the mission is.
Buy a block of credits once. When you need help, call us. We work it remotely or put engineers on site, in the US or overseas.
- Remote, CONUS, OCONUSOne block covers all three
- 1 to 4 engineersSized to the job
- Short-notice readyOverseas, when it can’t wait
- Travel built inNo separate travel bill
What a job looks like
Four common requests, start to finish, with the credits each one uses.
RemoteRemote config change
An engineer connects to your system and makes the change. No travel and no site visit.
- 1 engineer
- 1 day
Remote work has no minimum.
In the USSite visit in the US
An engineer travels to your site to find and fix the problem. Travel is included.
- 1 engineer
- 1 day on site
A trip in the US counts as at least 12 hours.
OverseasOne-week install abroad
A two-engineer team deploys to your site overseas, installs the system and brings it online.
- 2 engineers
- 1 week on site
A trip overseas counts as at least 48 hours.
Short noticeShort-notice fix abroad
Something is down overseas and it can’t wait. A two-engineer team deploys fast to get it running.
- 2 engineers
- 3 days on site
Counts as 48 hours, the least for a trip overseas.
Other common requests
- Remote fix1 engineer, half a day1.80
- Remote documentation1 engineer, 1 week18.00
- Remote ATO packageAuthority to Operate, 1 engineer, 1 week18.00
- Training in the US1 engineer, 3 days on site17.28
- Install in the US2 engineers, 1 week on site53.28
- Project in the US2 engineers, 2 weeks on site106.56
- Project overseas2 engineers, 2 weeks on site136.16
- Large team overseasUp to 4 engineers, 2 weeks on site217.49
Remote, stateside or overseas
The same credits cover all three. Travel is built in, so there is never a separate travel bill.
Remote
We work on your systems from our team, wherever they are.
CONUS
On site anywhere in the continental US.
OCONUS
On site outside the continental US, planned or on short notice.
Four steps
- 1
Buy a block
One purchase covers many jobs.
- 2
Request support
Tell us what you need, through your portal or by phone.
- 3
We deploy
Remote or on site. We agree the credit count first.
- 4
Credits draw down
Every job shows in your portal with what is left.
Why units buy credits
Faster starts
No new contract for every job. Work starts once we agree the credit count.
No surprises
You see the credit count before we start, and your balance any time.
One block, any work
Setup, fixes, training, documentation and compliance work.
Volume discounts
Larger credit blocks qualify for volume discounts. Contact us for details.
Estimate your mission
Pick an example or build your own. Add a part for each piece of the job, like a remote prep day and an on-site install.
Credit calculator
Pick where the work happens, the team hours and the team size. Team hours are time on the clock, all engineers together: 2 engineers working 8 hours side by side is 8 team hours. CONUS means inside the continental US, OCONUS means outside it. The total updates as you go.
This is an estimate. Your final credit count is confirmed in your quote before any work starts.
Details: how credits are counted
Hours are team hours. Time on the clock with the whole team working together. Two engineers on site for 48 hours is 48 team hours.
Bigger teams cost less per engineer. The first engineer counts in full. Each extra engineer adds 85% of the hours, not 100%.
Every trip has a floor. A trip counts as at least 12 hours in the US or 48 hours overseas, because the travel is the same for a short visit.
| Remote, per team hour | 0.45 credits |
| On site in the US (CONUS), per team hour | 0.72 credits |
| On site overseas (OCONUS), per team hour | 0.92 credits |
| Overseas on short notice, per team hour | 1.40 credits |
Example: the short-notice fix abroad. Two engineers, 3 days, counted as 48 team hours: 48 x 1.4 x 1.85 = 124.32 credits. Billing both engineers in full would be 134.40.
The technology and type of work help us plan and staff the job. They do not change the credit count.
Talk to us about credits
Tell us what you support and where. We will help you size the right block.
Already have credits? Sign in to your credit portal to see your balance and request support.